Fort Lauderdale: private property versus the right-of-way
If the container sits entirely on your own driveway, yard or private lot, we found no City of Fort Lauderdale rule requiring a permit. That covers most residential jobs.
If it has to sit in a street, swale, sidewalk or any public right-of-way, City Code Sec. 25-7 and 25-9 make it unlawful to place an obstruction there without a permit from the City Engineer. Permits come through the Development Services Department's Engineering Permitting Division, 700 NW 19th Avenue — 954-828-6520 (press 1) — with applications through the City's LauderBuild portal. Where the right-of-way will be occupied for more than 72 consecutive hours, the City requires a Revocable License Agreement, and a traffic control plan may be needed. Fees are set by City Commission resolution. Sec. 24-28(d) separately bars containers that serve private property from sitting in the street except for collection.
Apply a few business days before delivery, not the day before. We line the drop-off up with the approval so the container is not sitting there unpermitted.
How to get a Fort Lauderdale right-of-way permit, step by step
- Confirm the container cannot fit on your property. If it fits on the driveway, stop here.
- Apply through LauderBuild or call Engineering Permitting (954-828-6520). Have the address, the exact placement spot, the dates and the container size ready.
- Allow a few business days and pay the permit fee. If the placement runs past 72 hours, expect the Revocable License Agreement.
- Set up cones or markers if the permit requires them — we can supply these.
- Book delivery for the day the permit starts and tell us it is a street placement.
Every Broward city we serve: what its own code says
Each entry below summarizes the city's published code or web page as we read it in October 2026, with the department to confirm. Codes change; call before you rely on it.
Two things stand out. Lauderhill is the only city we serve that requires a permit for a dumpster on a private driveway — $150 for seven days, filed with the Building Division before the container arrives. And a handful of cities (Coconut Creek, Wilton Manors, Deerfield Beach, and for larger jobs Pompano Beach) regulate who may supply a construction container at all, which we explain plainly on each city page.
County roads and the HOA
City permits do not cover county-maintained roads. Anything placed in the right-of-way of a Broward County road needs a permit from the County's Highway Construction & Engineering Division (954-577-4555). State roads — US-1, State Road 7, Sunrise and Oakland Park Boulevards, Sample Road, A1A — are FDOT's. In practice, almost nobody puts a container on those; the driveway is where it goes.
If you live in an HOA community — common in Plantation, Coral Springs, Coconut Creek, Davie and Sunrise — the association usually has its own placement rules on top of the city's. Coconut Creek even requires an HOA letter with a City engineering permit. Check before delivery day.
Materials have their own rules
Permits are about placement; what goes in the container is a separate question. Concrete, asphalt and dense demolition debris have weight limits; hazardous materials — paint, chemicals, propane, batteries — cannot go in a roll-off at all; and in Broward County any demolition, and any renovation that disturbs suspect material, needs an asbestos survey by a Florida-licensed consultant and a notice to the County at least ten working days ahead (Broward County Code Sec. 27-180). The what-goes-in guide covers it.
Bottom line
Most residential rentals on private property need no permit — except in Lauderhill. If yours has to go on a public street, budget a few extra days for city approval and tell us when you book. Call (954) 287-2445 and describe where the container is going; we will tell you exactly what your city asks for.